AIRO
INSIGHT REPORT

From Compliance to Intelligence

Live environmental data revealing the true behaviour of your ventilation infrastructure.

Arcade Extract – AHU109
JCA Engineering Limited · Battersea Power Station · 6 Sensors · Grease System · Installed Oct 27, 2025
CRITICAL CLEANING REQUIRED — IMMEDIATE ACTION
Compliance · Fire Risk · Health & Safety
Live sensor data confirms that 2 zones are in CRITICAL condition and 1 zone is AT RISK, with micron deposit levels significantly exceeding the 200 µm compliance threshold. Immediate cleaning of the affected ductwork zones is required to meet regulatory compliance, mitigate fire risk from grease accumulation, and fulfil health & safety obligations under TR19 and relevant ventilation hygiene standards.
Zone 1 · Critical
5m from Canopy — Kitchen Corridor
2,007.90 µm
NON COMPLIANT · 1,004% OF THRESHOLD
Zone 2 · Critical
1m from Solis Canopy
1,745.00 µm
NON COMPLIANT · 873% OF THRESHOLD
Zone 3 · At Risk
1m from Manna's Canopy
363.40 µm
AT RISK · 182% OF THRESHOLD
Action Required: The responsible party must arrange professional ductwork cleaning for the above zones without delay. Continued operation without remediation constitutes a compliance breach and presents an unacceptable fire and hygiene risk. All readings are based on live sensor data as of the report date.
Deposit Accumulation Heatmap
Micron deposit levels across all 6 sensors — colour intensity reflects proximity to fail threshold (200 µm)
1m from
Solis Canopy
1744.80
µm · 349%
1m from
Manna's Canopy
363.40
µm · 72.7%
5m from Canopy
Kitchen Corridor
2007.90
µm · 401.6%
5m from Canopy
Deliveries
0.00
µm · 0%
20m from Fan
7.90
µm · 1.6%
10m from Fan
Vertical Riser
7.90
µm · 1.6%
0 µm
500+ µm
System Overview

Live System Status

Avg. System Deposit Level
688.65 µm
Fail at 200 µm · Estimated
⚠ CLEANING REQUIRED
Avg. System Temperature
25.21° C
Critical at 150°C
Current Compliance
Non Compliant
Deposit exceeds 200 µm threshold
BREACH
Max Temp (Last 24 hrs)
33.63° C
Deposit Production: Medium · Daily Usage: 12–16 hrs
Data Insights

Demand Patterns & Maintenance

Footfall Analysis

Deposit velocity reveals seasonal demand cycles
0 µm 200 400 600 800 FAIL OCT HALF-TERM CHRISTMAS CLEAN · JAN 30 FEB HALF-TERM Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 ~120µm ~400µm ~450µm ~730µm 0µm Jan 30 ~140µm ~260µm
October half-term drove the initial spike — increased kitchen footfall pushed deposits from ~120µm to ~400µm within weeks. Readings plateaued through November, then Christmas demand drove a second surge past the fail threshold to ~730µm. A clean event on January 30th brought readings down to 0µm — but deposits have been rapidly rebuilding through mid-to-late February, already climbing back toward warning levels.

Maintenance Forecast

February 2026 · Condition-based
Mon
Tue
Wed
Thu
Fri
Sat
Sun
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26TODAY
⚠ CLEAN NOW
Kitchen 2008µm
Solis 1745µm
27
28
1
⏰ EST. CLEAN
Manna’s 363µm
Feb 16–22 · Half-Term Week Higher kitchen demand expected
✓ Next check: 60+ days Deliveries · 20m Fan · Riser — Est. late April
Immediate
~3 days
60+ days
Half-term
TRUE VALUE
Localised Cleaning

Clean only where it matters

4 of 6 sensors are compliant. Only 2 zones need immediate cleaning — saving JCA up to 40% vs. blanket system cleaning. Your contractor works smarter, not harder.

Condition-Based

Clean only when required

Instead of relying on fixed cleaning schedules, AIRO enables condition-based maintenance, forecasting the precise date cleaning will be required. This reduces unnecessary servicing, prevents non-compliance, and ensures interventions occur exactly when risk dictates.

Next Clean Due

Cleaning culture, not just compliance

Scheduled cleans per year: 2. Current inspections: 0. AIRO replaces guesswork with condition-based forecasts — so JCA knows exactly when each zone needs attention.

Sensor Readings

Micron Deposit Trends

5m from Canopy
Kitchen Corridor · Sensor ...9149
NON COMPLIANT
Micron Reading
2007.90 µm
Estimated · Fail at 200 µm
Temperature
22.56° C
Critical at 150°C
200µm 02002000+ OctNovDecJanFeb
FAIL 200µm
401.6% of fail thresholdLast: Feb 25, 2026
1m from Manna's Canopy
Above Soft Serve · Sensor ...2877
72.7% OF THRESHOLD
Micron Reading
363.40 µm
Verified · Fail at 200 µm
Temperature
22.56° C
Critical at 150°C
200µm 0200800 CLEAN EVENT Jan 05Jan 19Jan 26Feb 09Feb 23
FAIL 200µm
AVG DAILY: 13.21µm (25-day)Last: Feb 25, 2026
5m from Canopy — Deliveries
Deliveries Corridor · Sensor ...3370
COMPLIANT
Micron Reading
0.00 µm
Verified · Fail at 200 µm
Temperature
25.19° C
Critical at 150°C
200µm 0200 Jan 05Jan 19Feb 09Feb 23
FAIL 200µm
AVG DAILY: 0.00µm (121-day)Last: Feb 25, 2026
Energy Performance

AIRO Energy Efficiency Rating (EER)

Energy Performance Rating

AIRO EER

System: Battersea Kitchen 3 · Last Updated: 12 Feb 2026
C
Amber — Moderate Efficiency
Estimated +9% energy use above clean baseline
Grease Level
372 µm
Annual Cost Impact
+£3,860
Carbon Impact
+4.2 tCO₂e
If Cleaned to A
Save £3,860/yr
A
0–100 µm
B
100–200 µm
C
200–400 µm
D
400–500 µm
E
500+ µm

Disclaimer: The Energy Efficiency Rating shown above uses illustrative example data for demonstration purposes only. Values may not reflect the actual energy performance of this system. This section is subject to revision or removal as the EER methodology is validated against live operational data.

Platform Roadmap

Coming Soon // Out of Scope Features

These features are in development — all powered by the same ultrasonic micron and temperature sensors already deployed at Battersea Power Station.

Coming Soon - Platform Roadmap
✏️ Click any text to edit